Bonding Schedule

The city requires a bond in the form of check, money order, letter of credit, or certificate of deposit.
  • Minimum Bond $500
  • Driveway Approach up to 16 feet = $1,500 + $50 / per foot over 16 feet
  • Minor Sidewalk repair = $1,000 (<20’)
  • Major Sidewalk repair = $1,500 (>20’)
  • Street Crane = $1,000
  • Water (up to 2 inches) or Sewer Lateral (up to 4 inches)  = $2,500
  • Water Main (over 2 inches) or Sewer Main (over 4 inches) = $5,000
All bonds subject to release upon final inspection (30 days minimum after completion of work)